Description
Logicor Timisoara is a modern logistics project, located at 2,5 kilometers from the ring road, 4 kilometers from Traian Vuia Airport and 9 kilometers from Timisoara city center. The acces in the park is made directy from DN6, the distance from A1 being 6 km.
Technical specification
- Building name
Building 1
- Total developed
19.966 sq. m
- Clear height
10.5 m clear height/div>
- Loading floor capacity
5t/sq.m
- Sprinkler system
Yes
- Loading docks
Yes
- Drive in doors
Yes
- Led lighting
Yes
- Column grid
12×24 m