Details
Last mile logistics hub located in the western part of Bucharest, near the ring road and Chitila railway node, location which ensures easy access to the A1 motorway and to National Road 7, a convenient access route to the Bucharest city central districts.
Technical specification
- Building name
C9
- Total developed
37.000 sq. M
- Clear height
11.5 m clear height
- Loading floor capacity
5 t/sq.m
- LED lighting
Yes
- Grid system
12×24 m
- Sprinkler system
Yes
- All utilities available
Yes
- Loading docks 1/800 sq.m
Yes